Specification Basis:
A lightning protection concept implemented by DEHN
Requirements:
A prerequisite for a final planning discussion is at least one planning service carried out by DEHN.
- Concept creation of separate lightning protection (S19292)
or
- Concept creation of non-separate lightning protection (S19293)
or
- Concept creation of separate / non-separate lightning protection (S19294)
and/or
- Grounding concept for lightning protection (S19295)
and / or
- Overvoltage protection design (S05596)
An on-site inspection with a lightning protection specialist company that was commissioned with the installation
Decision-maker for the implementation at the planned object
Specification:
- Presentation of the prepared planning
- Review of the planned lightning protection measures with the prevailing on-site conditions
- Agreement on the possible implementation of the planned measures
- Adjustment of the final planning documents
- If there is a lack of information on the part of the customer during the planning or implementation of technically unnecessary adjustments, a free supplementary offer will be made to adapt the planning documents.
Scope:
- Planning presentation of the implemented object
- Inspection of the object to be planned with discussion of the implementation options
- Adjustment of the final planning documents
Document Format:
- Handover of all documents electronically in PDF format
- Handover in open formats (e.g. .docx, .xlsx, .dwg, .nwd) with separate, signed handover document possible
General:
Our general terms and conditions for services DEHNconcept and DEHN test centre apply.