Final planning meeting (S16181)


Specification Basis:

A lightning protection concept implemented by DEHN


Requirements:

A prerequisite for a final planning discussion is at least one planning service carried out by DEHN.

  • Concept creation of separate lightning protection (S19292)

or

  • Concept creation of non-separate lightning protection (S19293)

or

  • Concept creation of separate / non-separate lightning protection (S19294)

and/or

  • Grounding concept for lightning protection (S19295)

and / or

  • Overvoltage protection design (S05596)

An on-site inspection with a lightning protection specialist company that was commissioned with the installation
Decision-maker for the implementation at the planned object


Specification:

  1. Presentation of the prepared planning
  2. Review of the planned lightning protection measures with the prevailing on-site conditions
  3. Agreement on the possible implementation of the planned measures
  4. Adjustment of the final planning documents
  5. If there is a lack of information on the part of the customer during the planning or implementation of technically unnecessary adjustments, a free supplementary offer will be made to adapt the planning documents.


Scope:

  1. Planning presentation of the implemented object
  2. Inspection of the object to be planned with discussion of the implementation options
  3. Adjustment of the final planning documents


Document Format:

  • Handover of all documents electronically in PDF format
  • Handover in open formats (e.g. .docx, .xlsx, .dwg, .nwd) with separate, signed handover document possible


General:

Our general terms and conditions for services DEHNconcept and DEHN test centre apply.