Basic principle
DIN EN 50522 (VDE 0101-2):2011-11 part 2 in the version valid at the time of placing the order;
DIN VDE 0100 part 410, part 540 in the version valid at the time of placing the order;
DIN VDE 0185-305-3 in the version valid at the time of placing the order;
DIN 18014 in the version valid at the time of placing the order;
DIN VDE 0151 in the version valid at the time of placing the order;
DIN VDE 0141 in the version valid at the time of placing the order;
(Should at the time of placing the order any of the above-mentioned standards be in a period of transition between two versions, the latest version will apply.)
(In the case of IEC standards, there is no transition period between two -versions.)
Prerequisites
- Basic information on the electrical installation (D+S data sheet)
- Construction of transformer, e.g. solid earthing / isolated neutral
- Optional: a fee-based site survey / project meeting
Service description
- Result of the calculation of the cross-sectional area of the conductor depending on the material
- The technical parameters of the electrical installation using a D+S calculation programme
Scope of service
- Calculation of the interior earthing in the station room
- Calculation of the protective conductor to the MEB
- Calculation of the MEB
- Calculation of the earthing and short-circuiting device (at primary terminals)
- Calculation of the earthing and short-circuiting device (at secondary terminals)
- General description (PDF document)
Document format
- All documents in the scope of service will be handed over electronically in PDF format.
- Documents can be provided in open format (e.g. .docx, .xlsx) if a separate handover document is signed to this effect.